CCI Signal Hill LLC (CCI SH), FERC Docket No. NP15-29-000 (May 28, 2015)

Reliability Standard: PRC-005-1.1b

Requirement: R2, R2.1

Violation Risk Factor: High

Violation Severity Level: Severe

Region: Texas RE

Issue: Texas RE, during a compliance audit, found that CCI SH had delayed the maintenance and testing for 31.7% of its DC circuits and 100% of its batteries by about 2.5 months, according to the intervals set out in its Protection System maintenance and testing program.

Finding: Texas RE found that this issue posed a moderate, but not a serious or substantial, risk to BPS reliability. Two of the plant's four units were Blackstart resources, and missed maintenance of Protection System equipment could have led to the failure of the Blackstart units and to relay misoperations. This could have delayed restoration of firm load. However, the plant's two other units had the ability to support the Blackstart and CCI SH was contracted to supply only 3.4% of ERCOT's primary Blackstart capability. To mitigate the violation, CCI SH (1) tested and completed maintenance on the circuits and batteries and (2) hired a consultant to review CCI SH's internal compliance program.

Penalty: $50,000 (aggregate for 6 violations)

FERC Order: FERC approved the settlement on June 26th, 2015.

CMS Generation Michigan Power, L.L.C. (CMSMP), Docket No. NP13-39-000 (May 30, 2013)

Reliability Standard: PRC-005-1.1b

Requirement: 2; 2.1

Violation Risk Factor: High

Violation Severity Level: Severe

Region: RFC

Issue: Following CMSMP’s self-certification, RFC found that CMSMP as a Generator Owner violated PRC-005-1 R2 in failing to keep evidence of maintenance and testing within defined intervals certain Protection System devices. At its Livingston generating station, CMSMP did not conduct maintenance and testing on the station’s 32 voltage sensing devices within the required seven-year interval.

Finding: RFC found that this violation posed a moderate risk, but not a serious or substantial risk, to BPS reliability. The relays had both audible and visual alarms located in the Livingston generating station control room, which is manned at all times when the plant is in operation. During the period of violation, CMSMP experienced no misoperations. In determining an appropriate penalty, RFC considered CMSMP’s internal compliance program (ICP), which is widely distributed throughout CMSPC and actively overseen by senior management and a compliance review committee. The violation was quickly corrected because of swift and proper use of the ICP, which identified the problems before any harm could occur. CMSMP had not previously violated PRC-005-1 R2. Certain of CMSMP’s affiliated entities have previous violations of PRC-005-1 R2, but RFC found the mitigating credit afforded CMSMP in its effective use of the ICP cancelled out potential penalty aggravation.

Total Penalty: $0

FERC Order: Issued June 28, 2013 (no further review)