Summary of FERC Meeting Agenda for November 2026

Alert
|
21 min read

Summaries of the agenda items for the Federal Energy Regulatory Commission's monthly open meeting to be held on November 19, 2026, pursuant to the sunshine notice released on November 12, 2026.

Electric

E-1, E-2 – ISO New England Inc., Central Maine Power Company, The Connecticut Light and Power Company, Fitchburg Gas and Electric Light Company, Green Mountain Power Corporation, New England Power Company, New Hampshire Transmission, LLC, NSTAR Electric Company, Public Service Company of New Hampshire, The United Illuminating Company, Unitil Energy Systems, Inc., Vermont Electric Cooperative, Inc., Vermont Transco LLC and Versant Power (Docket No. ER20-2054-000). On June 15, 2020, the above-captioned New England Transmission Owners (NETOs), joined by ISO New England Inc. (ISO-NE), filed a joint offer of settlement to resolve all issues in Docket No. EL16-19, a proceeding pursuant to section 206 of the Federal Power Act (FPA). The originating proceeding addressed the transparency, challenge procedures, cost derivation, and synchronization of Regional Network Service (RNS) and Local Network Service (LNS) formula rates under the ISO-NE Open Access Transmission Tariff. On December 28, 2020, the Commission approved the uncontested settlement, and on January 27, 2021, and July 29, 2022, the NETOs submitted respective Informational Filings in compliance with the order. On January 31, 2023, RENEW Northeast, Inc. submitted a formal challenge to the July 29, 2022 Annual Informational Filing, alleging inadequate rate input information and potential over-collection of operations and maintenance costs, which the Commission dismissed on March 24, 2025. On July 31, 2025, the NETOs submitted an Annual Informational Filing. On September 18, 2025, the Commission issued an order accepting in part and denying in part a January 31, 2024 formal challenge filed by the Maine Office of the Public Advocate (Maine OPA) to the July 31, 2023 Annual Informational Filing, directing a subset of the NETOs (Identified NETOs) to respond to information requests under the Formula Rate Protocols (Protocols) regarding 2022 asset condition project costs and permitting Maine OPA to supplement its challenge. Following the Identified NETOs' October 17, 2025 discovery responses, Maine OPA filed a supplement to its formal challenge on December 17, 2025, alleging that the Identified NETOs failed to justify their planning practices and project alternatives for the 2022 asset condition projects, which it amended on January 8, 2026, and January 29, 2026, to confine its challenge to The Connecticut Light and Power Company, NSTAR Electric Company, Public Service Company of New Hampshire, and New England Power Company. Meanwhile, on December 5, 2025, the Participating Transmission Owners Administrative Committee, on behalf of Central Maine Power Company (CMP), submitted a supplemental informational filing to the July 31, 2025 Annual Informational Filing, reducing CMP's 2026 LNS annual transmission revenue requirement (ATRR) from $151,420,099 to $136,774,147. On February 9, 2026, the New England States Committee on Electricity filed a formal challenge to the July 31, 2025 Annual Informational Filing, pursuant to Section VI.2 of the Protocols, requesting that the Commission direct CMP to remove financial-based employee incentive compensation costs from its RNS and LNS rates with refunds or institute an FPA section 206 proceeding. On August 21, 2026, the Commission issued an order denying Maine OPA's supplemental formal challenge. Agenda item E-1 and/or E-2 may be an order on the February 9 formal challenge and/or establishing new procedures to resolve the outstanding material issues in this proceeding.

E-3 – ArcLight Capital Partners, LLC and DigitalBridge Group, Inc. (Docket No. EC26-115-000). On June 22, 2026, ArcLight Capital Partners, LLC (ArcLight Capital) and DigitalBridge Group, Inc. (DigitalBridge), on behalf of their respective public utility affiliates (collectively, the Applicants), filed an application pursuant to sections 203(a)(1) and 203(a)(2) of the FPA. In the application, the Applicants requested authorization for a transaction in which an indirect subsidiary of DigitalBridge will merge with and into ArcLight Capital's immediate parent, ArcLight Capital Holdings, LLC (ArcLight Holdings), leaving ArcLight Holdings as an indirect subsidiary of DigitalBridge and SoftBank Group Corp. (SoftBank). According to the Applicants, the transaction is conditioned on SoftBank's prior acquisition of DigitalBridge in Docket No. EC26-67-000 and raises no horizontal or vertical market power concerns even when analyzed concurrently with related transactions in Docket Nos. EC26-67-000 and EC26-76-000. On August 21, 2026, Monitoring Analytics, LLC, acting in its capacity as the Independent Market Monitor for PJM Interconnection, L.L.C. (PJM) (IMM), filed comments opposing the application, asserting that combining DigitalBridge's 2,262 megawatt (MW) share of PJM generation with ArcLight Capital's 9,560.1 MW PJM fleet would increase structural market power in PJM and create the ability and incentive to exercise market power in a proposed Chesapeake submarket. Additionally, the IMM contended that the Applicants failed to demonstrate offsetting public benefits or commit not to remove resources serving existing load from the market to serve data centers. On September 8, 2026, the Applicants filed an answer and supplement, arguing that the transaction passes the Commission's competitive screens, involves no generation overlap in the proposed Chesapeake submarket, and does not implicate potential future data center commitments under section 203 review. Agenda item E-3 may be an order on the FPA section 203 application.

E-4 – Northern Indiana Public Service Company LLC and NiSource Generation Company LLC (Docket Nos. ER26-3474-000, ER26-3475-000). On August 3, 2026, Northern Indiana Public Service Company LLC (NIPSCO) and NiSource Generation Company LLC (GenCo) filed two concurrent applications for affiliate sales authorization pursuant to section 205 of the FPA. In the applications, NIPSCO and GenCo requested authorization for GenCo to make wholesale sales of energy and capacity at market-based rates to NIPSCO under two power purchase agreements (PPAs) dated November 7, 2025, and April 16, 2026. Specifically, the PPAs will enable NIPSCO to provide retail service under state-approved special contracts to two data center developers in its service territory, Amazon Data Services, Inc. in Docket No. ER26-3474-000 (ramping up to 2,400 MW by 2032) and Midnight Sun Ventures LLC in Docket No. ER26-3475-000 (ramping up to 300 MW by 2030). To serve these loads while insulating NIPSCO's captive retail customers from incremental capital costs, GenCo will construct, own or lease, and operate up to 3,000 MW of generation in the Midcontinent Independent System Operator, Inc. market, comprising two 1,300 MW combined cycle gas turbine generators and a 400 MW battery energy storage system. Agenda item E-4 may be an order on the applications for affiliate sales authorization.

E-5 – Kammer Juniata Transmission, LLC (Docket No. ER26-1734-002). On March 12, 2026, Kammer Juniata Transmission, LLC (Kammer Juniata) filed a request to establish a formula rate and authorize transmission rate incentives, pursuant to sections 205 and 219 of the FPA and Order No. 679. In the request, Kammer Juniata proposed a forward-looking formula rate template and implementation protocols (Formula Rate) under Attachment H-42 of the PJM Interconnection, L.L.C. (PJM) Open Access Transmission Tariff, including a 10.75 percent base return on equity (ROE), to recover its investment in an approximately $1.7 billion, 222-mile, 765 kV transmission line from West Virginia to Pennsylvania selected in PJM's 2025 Regional Transmission Expansion Plan (RTEP) Window 1. Kammer Juniata also requested a 100 percent abandoned plant incentive, a 100 percent construction work in progress incentive, a 60 percent equity and 40 percent debt hypothetical capital structure prior to the project's in-service date, a 50-basis-point ROE adder for Regional Transmission Organization (RTO) participation, and replication of the Formula Rate and non-project-specific incentives for future PJM affiliates. On April 7, 2026, the Pennsylvania Office of Consumer Advocate (PA OCA) and American Municipal Power, Inc. filed respective protests, and the Pennsylvania Public Utility Commission filed comments, challenging the proposed base ROE, Formula Rate inputs, and rate incentives on the grounds that PJM's selection of the project was not fair and open and failed to address posted reliability violations. On July 10, 2026, the Commission issued an order, accepting the Formula Rate subject to hearing and settlement judge procedures on the template, base ROE, and proxy cost of debt, while granting the requested rate incentives after finding that PJM's RTEP selection satisfied Order No. 679's rebuttable presumption. On August 7, 2026, PA OCA filed a request for rehearing of the July 10 order, contending that the Commission erred in applying the Order No. 679 rebuttable presumption and declining to set the project's reliability need for hearing despite assertions that the project resolved zero flowgate violations solicited in 2025 RTEP Window 1. On August 19, 2026, PJM filed an answer opposing the rehearing request. Agenda item E-5 may be an order on the rehearing request.

E-6 – Appalachian Power Company, AEP Appalachian Transmission Company, Inc., and American Municipal Power, Inc. v. Appalachian Power Company et al., and AEP Appalachian Transmission Company Inc., et al. (Docket Nos. ER17-405-006, ER17-406-006, EL26-56-001). On March 17, 2026, American Municipal Power, Inc. (AMP) filed a formal challenge and complaint against Appalachian Power Company, et al. and AEP Appalachian Transmission Company, Inc., et al. (collectively, AEP East), pursuant to sections 206, 306, and 309 of the FPA and Attachments H-14A and H-20A of the PJM Interconnection, L.L.C. Open Access Transmission Tariff. In the formal challenge and complaint, AMP challenged the accumulated deferred income tax (ADIT) adjustments for net operating loss carryforwards (NOLC) in AEP East's May 27, 2025 annual formula rate updates for the 2024 rate year, alleging that AEP East's separate return methodology inflates rate base in violation of the Commission's stand-alone method and improperly relies on three March 8, 2024 Internal Revenue Service (IRS) private letter rulings (PLRs) issued to AEP East's retail affiliates. On April 7, 2026, Old Dominion Electric Cooperative filed comments supporting the complaint, and AEP East filed an answer contending that the Commission already approved identical NOLC ADIT adjustments in orders issued on June 30, 2025, and November 4, 2025 (2025 Orders) to prevent an IRS normalization violation and to preserve accelerated depreciation. On July 16, 2026, the Commission issued an order, rejecting the formal challenge and denying the complaint, finding that the adjustments remain necessary to comply with IRS normalization rules under the PLRs notwithstanding the pending appeal of the 2025 Orders before the United States Court of Appeals for the District of Columbia Circuit (D.C. Circuit). On August 17, 2026, AMP filed a request for rehearing, asserting that the July 16 order conflicts with Supreme Court precedent on consolidated tax returns, improperly delegates ratemaking authority to the IRS by adopting retail PLRs without analyzing factual differences, and erroneously relies on the non-final 2025 Orders pending before the D.C. Circuit. Agenda item E-6 may be an order on the rehearing request.

E-7 – The Empire District Electric Company and Southwest Power Pool, Inc. (Docket No. ER26-3348-000). On July 31, 2026, The Empire District Electric Company (Empire) and Southwest Power Pool, Inc. (SPP) submitted a tariff filing, pursuant to section 205 of the FPA. In the filing, Empire proposed revisions to Attachment H, Addendum 18 of the SPP Open Access Transmission Tariff in order to transition from a historic to a forward-looking transmission formula rate and implementation protocols, establish a projected 2027 zonal ATRR of $63.7 million and regional ATRR of $17.7 million effective January 1, 2027, adopt a 10.69 percent base ROE (11.19 percent total ROE including its 50-basis-point RTO participation adder), update depreciation rates, and include placeholders for construction work in progress and abandoned plant incentives requested in Docket No. ER26-3172-000. On August 21, 2026, the Kansas Corporation Commission (KCC) and the Cities of Lockwood, Monett, and Mount Vernon, Missouri (collectively, the Cities) filed respective protests, requesting suspension of the proposed tariff revisions and establishing hearing procedures. Namely, KCC and the Cities challenged the proposed 10.69 percent base ROE for averaging Value Line and Bloomberg betas rather than using only Bloomberg betas (which the Cities calculated would yield a 10.295 percent base ROE), identified a conflicting 11.33 percent total ROE reference in Note 6 of the template, and raised concerns regarding a $5.2 million depreciation expense increase, among other items. On September 8, 2026, Empire filed an answer, defending its proposed base ROE, depreciation study, electric rent allocator, and regulatory asset and hold harmless adjustments, while agreeing to correct the Note 6 ROE reference, clarify several template inputs, and revise its implementation protocols regarding formal challenges and adjustment disclosures. Agenda item E-7 may be an order on the tariff filing.

E-8 – Jefferson Davis Electric Cooperative, Inc. and Midcontinent Independent System Operator, Inc. (Docket No. ER26-3677-000). On September 1, 2026, Midcontinent Independent System Operator, Inc. (MISO), on behalf of Jefferson Davis Electric Cooperative, Inc. (JDEC), submitted a tariff filing pursuant to section 205 of the FPA and Order No. 679. In the filing, JDEC proposed a company-specific Attachment O and revisions to Schedules 7, 8, and 9 of the MISO Open Access Transmission, Energy and Operating Reserve Markets Tariff to add JDEC as a Transmission Owner (TO) in MISO Zone 29 (Entergy Louisiana rate zone), implement a forward-looking formula rate and protocols to recover its ATRR, and authorize a 50-basis-point RTO participation adder atop the 9.98 percent MISO base ROE for a 10.48 percent total ROE, effective December 1, 2026. According to JDEC, a non-jurisdictional electric distribution cooperative in Louisiana, it has completed a 230 kV transmission line that will be placed under MISO's functional control following anticipated MISO Board approval of its TO membership in November 2026. To avoid an 18-month cost recovery lag, JDEC proposed modifying the MISO Generic Attachment O non-levelized template to calculate a projected net revenue requirement trued up with interest to actual Cooperative Finance Corporation Form 7 data, while committing to subject its rates to refund and requesting waiver of certain cost-of-service filing requirements. Agenda item E-8 may be an order on the tariff filing.

E-9 – City of Hastings, Nebraska d/b/a Hastings Utilities (Docket No. TS26-10-000). On September 30, 2026, the City of Hastings, Nebraska d/b/a Hastings Utilities (Hastings) filed a request for waiver, pursuant to section 358.1(d) of the Commission's regulations. In the request, Hastings sought waiver of the Standards of Conduct requirements and Order Nos. 717, 889, and 2004 that may apply under the Commission's reciprocity rules. Specifically, Hastings is a non-jurisdictional municipal utility serving approximately 14,000 customers in Nebraska that owns and operates 355 MW of generation and 25.7 miles of transmission facilities under the operational control of the Omaha Public Power District and the authority of the Southwest Power Pool, Inc. Reliability Coordinator. Hastings asserted that it qualifies for the waiver as a small utility disposing of no more than 4,000,000 megawatt-hours (MWh) annually, with sales of 1,198,867 MWh in 2024 and 1,331,964 MWh in 2025. Agenda item E-9 may be an order on the waiver request.

Miscellaneous

M-1 – Denial of Rehearing Requests by Operation of Law Under the Commission's Rules of Practice and Procedure (Docket No. RM26-13-000). The formal record in Docket No. RM26-13-000 has not yet been populated. Agenda item M-1 may be an action that is being taken sua sponte by the Commission with respect to a new rulemaking proceeding relating to the Denial of Rehearing Requests by Operation of Law Under the Commission's Rules of Practice and Procedure.

Certificates

C-1 – Sabine Pass Liquefaction, LLC, Sabine Pass Liquefaction Stage V, LLC, Sabine Crossing, LLC, and Cheniere Creole Trail Pipeline, L.P. (Docket Nos. CP24-75-000, CP24-75-001, CP25-505-000, CP25-506-000). On February 29, 2024, Sabine Pass Liquefaction, LLC and Sabine Pass Liquefaction Stage V, LLC (collectively, Sabine Pass) and Sabine Crossing, LLC (Sabine Crossing) filed a joint application in Docket No. CP24-75-000, pursuant to sections 3 and 7(c) of the Natural Gas Act (NGA) to construct and operate the Sabine Pass Stage 5 Expansion Project (Project) and the Sabine Crossing Pipeline (SCPL), from which Sabine Crossing withdrew the SCPL application on March 13, 2024, to refine the pipeline scope in Docket No. PF23-2-000. On June 6, 2025, Sabine Pass, Sabine Crossing, and Cheniere Creole Trail Pipeline, L.P. (collectively, the Sabine Pass Applicants) filed an amended and restated joint application for NGA section 3 authorization and a Certificate of Public Convenience and Necessity (CPCN) in Docket Nos. CP24-75-001, CP25-505-000, and CP25-506-000 pursuant to sections 3 and 7(c) of the NGA. In the joint application, the Sabine Pass Applicants requested authorization to site, construct, and operate an expansion of the Sabine Pass Liquefied Natural Gas Terminal in Cameron Parish, Louisiana, including three new liquefaction trains, along with the new 55.6-mile interstate SCPL, new and modified compressor and meter stations on the SCPL and the Creole Trail Pipeline system, and appurtenant facilities in Texas and Louisiana to deliver up to 3.6 billion cubic feet per day of natural gas to the expanded terminal. On April 3, 2026, the Commission issued the draft Environmental Impact Statement (EIS) for the Project, and following comments from landowners, non-governmental organizations, agencies, and the Sabine Pass Applicants, issued the final EIS on September 25, 2026, concluding that the Project would result in less-than-significant environmental effects subject to recommended mitigation conditions. Agenda item C-1 may be an order on the joint application.

C-2 – Mountain Valley Pipeline, LLC (Docket No. CP26-14-000). On October 23, 2025, Mountain Valley Pipeline, LLC (Mountain Valley) filed an abbreviated application for a CPCN, pursuant to section 7(c) of the NGA. In the CPCN application, Mountain Valley requested authorization to construct, modify, and operate the Mountain Valley Pipeline Boost Project (MVP Boost Project), comprising a new compressor station in Montgomery County, Virginia, and turbine additions and modifications at three existing compressor stations in West Virginia, to provide 600,000 dekatherms (Dth) per day of incremental firm natural gas transportation service on the Mountain Valley Mainline. Numerous stakeholders, including project shippers, agencies, environmental organizations, and individuals, filed motions to intervene and substantive comments, supporting the CPCN application or raising concerns regarding project need, environmental and safety impacts, National Environmental Policy Act segmentation, and requests for an environmental impact statement. Throughout the proceeding, Mountain Valley responded to multiple Commission staff environmental information requests and submitted a March 24, 2026 Biological Assessment as supplemented on April 7, 2026. On August 7, 2026, the Commission issued the Environmental Assessment (EA) for the MVP Boost Project, concluding that approval, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. Following a September 11, 2026 permit update, Mountain Valley submitted a project update on November 10, 2026, stating that the 90-day Federal Authorization Decision Deadline passed on November 5, 2026, and requesting Commission approval at the November 19, 2026 open meeting. Agenda item C-2 may be an order on the CPCN application.

C-3 – Mountain Valley Pipeline, LLC (Docket No. CP26-14-001). As detailed previously in agenda item C-2, on October 23, 2025, Mountain Valley filed an abbreviated application for a CPCN pursuant to section 7(c) of the NGA to construct, modify, and operate the MVP Boost Project in West Virginia and Virginia. On April 8, 2026, Craig County, Virginia (Craig County) filed a motion to intervene out-of-time pursuant to Rule 214 of the Commission's Rules of Practice and Procedure, asserting that the CPCN application identified an alternative compressor station site in Craig County, that the project poses air quality, noise, and public safety impacts to the county, and that good cause existed for late intervention because Mountain Valley failed to notify the county or publish notice in a local newspaper with widespread circulation in the county. On April 13, 2026, Mountain Valley filed an answer opposing late intervention, stating that the proposed Swann Compressor Station is located in Montgomery County, Virginia, the Craig County alternative site was rejected, and notice of the application was published in the Roanoke Times in November 2025. On May 5, 2026, the Commission issued a notice denying Craig County's late motion to intervene. On June 4, 2026, Craig County filed a request for rehearing of the May 5 notice pursuant to section 19(a) of the NGA, contending that the Commission arbitrarily and capriciously failed to evaluate the Rule 214(d) good-cause factors, its lack of notice in its legally designated newspaper, and its local governance and public safety interests regarding increased mainline pipeline pressure and proximity to the proposed Swann Compressor Station. Agenda item C-3 may be an order on the rehearing request.

C-4 – Columbia Gas Transmission, LLC (Docket No. CP26-20-000). On November 13, 2025, Columbia Gas Transmission, LLC (Columbia) filed an abbreviated application for a CPCN, pursuant to section 7(c) of the NGA. In the CPCN application, Columbia requested authorization to construct and operate the Southeast Virginia Energy Storage Project (Project) in Sussex County, Virginia, comprising a new liquefied natural gas storage, liquefaction, and vaporization facility and an interconnecting bi-directional pipeline, to provide up to 1,100,000 Dth of commercial storage capacity by April 1, 2030. According to Columbia, the Project is 100 percent subscribed under a 20-year precedent agreement with Virginia Natural Gas, Inc. (VNG) to meet winter peak-day demand, and Columbia proposed a new firm liquefaction storage service under Rate Schedule FLS with initial incremental recourse rates and fuel and electric power cost surcharges. Numerous stakeholders, including VNG, local distribution companies, state legislators, industry associations, agencies, and a landowner, filed motions to intervene and substantive comments supporting the Project or raising environmental and water resource inquiries. Throughout the proceeding, Columbia responded to multiple Commission staff environmental data requests through October 19, 2026. Following a June 15, 2026 Letter of Determination from the Pipeline and Hazardous Materials Safety Administration (PHMSA), the Commission issued the EA for the Project on July 17, 2026, in cooperation with PHMSA, finding that approval of the Project with appropriate mitigating measures would not constitute a major federal action significantly affecting the quality of the human environment. Agenda item C-4 may be an order on the CPCN application.

C-5 – Forza Pipeline LLC and Bull Run Pipeline LLC (Docket Nos. CP26-34-000, CP26-35-000). On December 3, 2025, Forza Pipeline LLC (Forza) and Bull Run Pipeline LLC (Bull Run) (collectively, the Applicants) filed a joint abbreviated application for CPCNs and related authorizations, pursuant to section 7(c) of the NGA. In the joint CPCN application, the Applicants requested authorization for Forza to construct and operate the Forza Pipeline Project (Project), comprising a new 35.9-mile interstate pipeline and appurtenant metering, valve, and riser facilities in New Mexico and Texas, to provide up to 750,000 Dth per day of firm transportation service from the Delaware Basin toward the Waha Hub (87 percent subscribed under precedent agreements). Additionally, the Applicants requested blanket certificates, approval of Forza's initial recourse rates and tariff, and authorization in Docket No. CP26-35-000 for Forza to lease 750,000 Dth per day of capacity on Bull Run's intrastate pipeline extension to the Waha Hub (Bull Run Extension), along with a limited-jurisdiction certificate for Bull Run. On January 6, 2026, and February 27, 2026, Spanish Dagger, Ltd., SHER Cow Country, L.P., and Loving Cow Country, L.P. (collectively, the Haley Family Property Owners) filed a joint protest and scoping comments challenging project need, alleging impermissible National Environmental Policy Act (NEPA) segmentation of the Bull Run Extension, raising concerns over impacts to ranching, caliche reserves, wells, and invasive species on their Texas property, and proposing a bypass route. The Applicants filed answers on January 27, 2026 and March 30, 2026, and responded to multiple Commission staff environmental information requests. On August 28, 2026, the Commission issued the EA for the Project in cooperation with the U.S. Bureau of Land Management, rejecting the bypass alternative and concluding that the Project, with appropriate mitigating measures, would not significantly affect the quality of the human environment. On September 28, 2026, the Haley Family Property Owners and the New Mexico Department of Wildlife filed comments on the EA, with the Haley Family Property Owners reiterating their need, NEPA segmentation, and land use objections and alleging $1.78 million in stranded caliche reserves, to which the Applicants filed an answer on October 5, 2026. Agenda item C-5 may be an order on the joint CPCN application.

C-6 – Texas Eastern Transmission, LP (Docket No. CP26-75-000). On January 23, 2026, Texas Eastern Transmission, LP (Texas Eastern) filed an abbreviated application for a CPCN, pursuant to section 7(c) of the NGA. In the CPCN application, Texas Eastern requested authorization to construct and operate the Line 31 Expansion Project (Project), comprising a 10.2-mile pipeline loop, a 1.6-mile delivery lateral, a new compressor station, and a new meter and regulator station in Madison and Hinds Counties, Mississippi, to provide 125,000 Dth per day of incremental firm transportation capacity to serve Entergy Mississippi, LLC's (Entergy) proposed Traceview Advanced Power Station by September 1, 2028. Texas Eastern stated that Entergy executed a precedent agreement for 100 percent of the incremental capacity, and proposed initial incremental recourse rates and fuel and electric power cost tracking. Between February 20, 2026, and May 6, 2026, landowner Kevin J. Robinson filed a motion to intervene and comments challenging easement valuation for the Sacred Heart Village subdivision and raising concerns regarding private access road use, tree clearing, drainage, pond siltation, and safety, to which Texas Eastern filed an answer on May 5, 2026, contending that compensation is outside the Commission's jurisdiction, that its 1955 easement provides line and road access rights, and disturbances will be restored. Throughout the proceeding, Texas Eastern responded to multiple Commission staff environmental information requests through September 23, 2026. On July 24, 2026, the Commission issued the EA for the Project in cooperation with the National Park Service regarding a 5.76-acre crossing of the Natchez Trace Parkway, finding that approval of the Project, with appropriate mitigating measures, would not significantly affect the quality of the human environment, after which Mr. Robinson, the U.S. Environmental Protection Agency Region 4, landowner TerryAnn Towers Saint Amand, and the U.S. Fish and Wildlife Service submitted comments and consultation filings between August 7, 2026, and September 9, 2026. Agenda item C-6 may be an order on the CPCN application.

Caroline Winther (White & Case, Associate, Washington, DC) contributed to the development of this publication.

White & Case means the international legal practice comprising White & Case LLP, a New York State registered limited liability partnership, White & Case LLP, a limited liability partnership incorporated under English law and all other affiliated partnerships, companies and entities.

This article is prepared for the general information of interested persons. It is not, and does not attempt to be, comprehensive in nature. Due to the general nature of its content, it should not be regarded as legal advice.

© 2026 White & Case LLP

Top